SteelThumb

Inventory readiness

A preorder limit needs real parts behind it.

SteelThumb keeps paid checkout disabled until Grow Kit, SeedPort, and PlotTags each have first-batch component allocation, spare reserves, reorder points, supplier lead times, and make-to-order constraints recorded.

Inventory readiness matrix

ProductFirst-batch assumptionMissing before checkoutState
SteelThumb Grow Kit5 pilot kits for a 20-bag guild SKU.Grow bags, irrigation fittings, PlotTags starter sets, automation-prep parts, packaging, spares, storage bins, and supplier lead times.Draft allocation; checkout blocked
SeedPort5 standalone pilot units.Tray/rack parts, lighting/airflow scope, controller-prep parts, packaging, spares, and supplier lead times.Draft allocation; checkout blocked
PlotTags20 tag-set pilot packs.Tag material, labels, stakes/clips, header cards or bags, replacement-label reserve, ID range allocation, and supplier lead times.Draft allocation; checkout blocked

Records required before paid checkout

Source files

  • products/inventory-readiness.md
  • products/inventory-plan.csv
  • products/supplier-quote-comparison.csv
  • products/replacement-parts.csv
  • products/batch-build-traveler.md

Required inventory decisions

  • First sellable batch size
  • On-hand or committed supplier order by component group
  • Reserved spare and replacement quantity
  • Reorder point and supplier lead time
  • Allocation rule for paid preorders versus replacement parts

Checkout blocker

  • No paid checkout until complete kits can be allocated by SKU
  • No preorder quantity above confirmed component and packaging capacity
  • No customer promise until lead time, storage, and reorder rules are recorded