Start and lift tiger nut: Quebec supplier route
Scope and prerequisites
Use the supplier's labeled food-crop stock, a way to assess frost risk and germination temperature, planting medium/bed, a fork and a collection surface. Confirm with the supplier that the planting material is tubers: its shop uses the category “seeds” without distinguishing botanical seed in the sowing paragraph. Obtain its medium, watering, feeding and transplant directions before starting; this page is not a complete season-long care route.
Establish
The supplier recommends indoor starting 3–6 weeks before the frost-free planting opportunity, or direct planting after frost risk.1
Plant 2 cm deep, with 40 cm between plants.1
The supplier reports emergence in 7–30 days at 28–30°C.1
Depth datum and indoor cell size are unspecified. Editorial follow-up: record planting date, material, temperature and first shoots. If emergence has not occurred by the stated interval, compare actual conditions with the supplied directions and refer the lot to the supplier before changing treatment; no supported soaking or dormancy-breaking recipe was established.
Lift and separate
In autumn when leaves are dry, or immediately after frost, loosen the soil with a fork, lift plants and collect attached tubers.1
The grower cleans harvested tubers immediately and spreads wet tubers in front of a fan.1
Editorial follow-up: inspect the disturbed soil for detached tubers and record losses or damage. The supplier's pressure-washing and garage-curing details are not validated food-processing or storage endpoints here. Pot dimensions, count, medium and care remain unspecified despite the supplier's positive container description. Do not silently fill them with another region's trial settings. Return to the crop hub.