Root aibika cuttings in potting mix
Use this task for identified cultivated aibika planting stock. It ends with observation of establishment; the source does not provide a measured rooting-success rate. Retain supplier and plant identity. Obtain cuttings, potting mix, a suitable nursery container and a soil-temperature measurement before starting. Exact nursery dimensions and cutting-node requirements remain unspecified in this supplier source.
Prepare and place
Take cuttings when soil temperature is at least 25 °C under Green Harvest’s guidance.1
Use cuttings 10–20 cm long for the supplier’s potting-mix route.1
Bury half of each cutting in potting mix and keep the mix moist.1
Editorial implementation: label each cutting and record placement date, measured soil temperature and its initial condition. Do not substitute a short warm-air forecast for a soil reading. Keep the source’s moist-medium instruction as the care target; it supplies no fixed irrigation volume or frequency.
Plan the final position
Provide full sun or partial shade, ample water and fertile mulched soil for growing plants.1
Green Harvest specifies 60 cm between plants.1
The supplier does not specify when a cutting is sufficiently rooted for transplanting, rootball handling, final planting depth or a fertilizer rate. Obtain those inputs before treating this nursery task as a complete field-establishment route. A spacing interval does not determine pot size. The longer direct-field cuttings in the PROSEA source notes are a separate practice, not values to average with this nursery branch.
Check establishment
Editorial observation plan: distinguish no new growth from growth followed by decline. Record medium moisture, measured temperature, visible stem damage and the sequence of changes. New shoots alone are not documented rooting-readiness criteria in this source. Refer failed cuttings to the supplier with those records before changing hormones, fertilizer or media; no rescue chemical or diagnostic certainty is supported here. Compare the condition of replacement material under the corrected, documented conditions.
After final establishment is separately resolved, use the young-tip harvest task. This link joins two sources editorially; it is not a trial of a combined protocol.