Establish curry leaf in the Tamil Nadu field route
Start with labeled curry-leaf tree stock and a locally suitable drained field site. Before using this partial establishment route, arrange a soil-based nutrient plan and an irrigation volume appropriate to the soil and weather. The historical source schedule alone does not provide those inputs.
TNAU specifies one-year-old curry-leaf seedlings, with one seedling centred in each planting pit.1
Use 30 × 30 × 30 cm planting pits at 1.2–1.5 m spacing in the TNAU field route.1
TNAU irrigates immediately after planting, again on the third day and then weekly.1
At 1 m plant height, remove the terminal bud to encourage basal branching and maintain five or six branches per bush.1
Editorial planting implementation: preserve the root plug, position it at its existing soil level, backfill and settle without leaving the root zone flooded. Inspect soil moisture and rainfall before following the calendar schedule; record actual irrigation and plant response. Transplant depth, soil-level handling and weather adjustment are disclosed implementation choices, not measured TNAU settings.
For terminal-bud removal, use a clean pinch or cut at the shoot tip; do not remove a metre of stem. Record lateral growth before further shaping. Exact branch-selection timing and repeat pruning need additional guidance.
If a plant wilts, distinguish dry soil from continuing wilt in wet ground and inspect drainage/root condition before adding water. Seek local diagnosis for persistent decline, spots or visible pests. The old source's pesticide directions have not been assessed against current labels and are not adopted. Check subsequent growth after any care change.
TNAU language versions differ on pit-preparation lead time and temperature, retained in source notes; no disputed value is used here. Seed starting and a complete ongoing fertilizer programme remain separate unfinished tasks. Harvest context.