---
type: Procedure
title: Train a young peach to an open centre in Georgia
description: Initial heading, scaffold selection and second-season crop removal in the UGA standard-spacing
  route.
status: draft
sources:
- id: uga-c877
  title: Kathryn C. Taylor — Peach Orchard Establishment and Young Tree Care, UGA C877, reviewed February
    2012
  resource: https://fieldreport.caes.uga.edu/wp-content/uploads/2025/08/C-877_3.pdf
steelthumb:
  ontology_version: '0.2'
  license: MIT
  claims:
  - id: head
    kind: recommendation
    statement: At planting, shorten the main stem to 20–24 in. above the soil surface.
    applicability:
      conditions: Southeastern US young nursery peach, standard-spacing open-centre training; not a fan,
        patio tree or perpendicular V.
    evidence:
    - source_id: uga-c877
      relation: supports
      locator: PDF page 3 — Tree Training; Figure 2
    quantity:
      property: initial_heading_height
      unit: in
      min: 20
      max: 24
      basis: Height above soil, not length removed.
  - id: laterals
    kind: recommendation
    statement: Remove nursery laterals below 24 in. above ground.
    applicability:
      conditions: Southeastern US young nursery peach, standard-spacing open-centre training; not a fan,
        patio tree or perpendicular V.
    evidence:
    - source_id: uga-c877
      relation: supports
      locator: PDF page 3 — Tree Training; Figure 2
    quantity:
      property: lateral_removal_height_threshold
      unit: in
      value: 24
      basis: Remove nursery laterals below this height; initial young-tree step only.
  - id: select
    kind: recommendation
    statement: By midsummer, retain three to five outward-growing shoots distributed around the trunk
      as scaffolds; remove the other shoots.
    applicability:
      conditions: Southeastern US young nursery peach, standard-spacing open-centre training; not a fan,
        patio tree or perpendicular V.
    evidence:
    - source_id: uga-c877
      relation: supports
      locator: PDF page 3 — Tree Training; Figure 2
    quantity:
      property: scaffold_count
      unit: shoot
      min: 3
      max: 5
      basis: First-year open-centre framework, not fruit count.
  - id: suckers
    kind: recommendation
    statement: Remove rootstock suckers while thinner than a pencil by pulling downward at their junction,
      avoiding tree damage.
    applicability:
      conditions: Southeastern US young nursery peach, standard-spacing open-centre training; not a fan,
        patio tree or perpendicular V.
    evidence:
    - source_id: uga-c877
      relation: supports
      locator: PDF page 3 — Tree Training; Figure 2
  - id: crop
    kind: recommendation
    statement: For standard-spacing trees in their second growing season, remove developing fruit early
      and completely.
    applicability:
      conditions: Southeastern US young nursery peach, standard-spacing open-centre training; not a fan,
        patio tree or perpendicular V.
    evidence:
    - source_id: uga-c877
      relation: supports
      locator: PDF page 3 — Tree Training; Figure 2
  relations:
  - predicate: applies_to
    target: /crops/peach.md
---

# Train a young peach to an open centre in Georgia

Start with a newly planted, untrained [peach](../crops/peach.md) whose nursery form fits this route. Use the [Georgia establishment procedure](plant-peach-georgia.md), a ruler and suitable pruning tools. Identify the graft and nursery branches before cutting. This is formative work, not renovation of an established tree. Ask the nursery to adapt the plan if stock is already trained or has an unsuitable branch structure.

## At planting

<a id="head"></a>
At planting, shorten the main stem to 20–24 in. above the soil surface.[^uga-c877]

<a id="laterals"></a>
Remove nursery laterals below 24 in. above ground.[^uga-c877]

The two height instructions belong to the same source sequence. Do not reinterpret either as the amount of stem to remove. Cutting technique at the exact bud or branch junction is not illustrated in detail; obtain a demonstration if those landmarks are unfamiliar.

## First growing season

<a id="select"></a>
By midsummer, retain three to five outward-growing shoots distributed around the trunk as scaffolds; remove the other shoots.[^uga-c877]

<a id="suckers"></a>
Remove rootstock suckers while thinner than a pencil by pulling downward at their junction, avoiding tree damage.[^uga-c877]

Editorial check: distinguish a retained scion scaffold from a shoot arising below the graft or at the root. Reassess the origin before removing uncertain growth. The small-sucker instruction is not permission to tear off large woody limbs. Record scaffold positions and observe whether new competing shoots recur.

## Second growing season

<a id="crop"></a>
For standard-spacing trees in their second growing season, remove developing fruit early and completely.[^uga-c877]

This crop-removal decision belongs to standard-spacing establishment. It does not apply automatically to the [perpendicular-V route](../guides/peach-training-system-decisions.md), which retains an early crop. Record removal and subsequent framework growth separately; no resulting yield is promised.

This completes the source's initial framework sequence, not all bearing-tree pruning. Mature renewal cuts, irrigation, nutrition and pest management still need maintained regional procedures. UK spring/summer pruning guidance is separately scoped in the [UK care guide](../guides/peach-uk-care.md); these Georgia timings are not universal. [Inspection notes](../sources/peach-training-research.md).


[^uga-c877]: [Kathryn C. Taylor — Peach Orchard Establishment and Young Tree Care, UGA C877, reviewed February 2012](https://fieldreport.caes.uga.edu/wp-content/uploads/2025/08/C-877_3.pdf).
