---
type: Procedure
title: Prepare a buried nagaimo pipe bed
description: Plus Y’s nagaimo-specific Clever Pipe preparation branch; Japanese buried garden-soil system,
  not a freestanding pot or jinenjo recipe.
status: draft
sources:
- id: plusys-pipe
  title: Plus Y’s — Nagaimo and jinenjo Clever Pipe instructions
  resource: https://plusys.blog/cleverpipe.html
steelthumb:
  ontology_version: '0.2'
  license: MIT
  claims:
  - id: hardware
    kind: recommendation
    statement: 'Use the nagaimo pipe: approximately 105 cm long and 6.5 cm diameter.'
    applicability:
      conditions: Plus Y’s nagaimo-specific Clever Pipe preparation branch; Japanese buried garden-soil
        system, not a freestanding pot or jinenjo recipe.
    evidence:
    - source_id: plusys-pipe
      relation: supports
      locator: 長芋の栽培方法 / クレバーパイプ長芋用
    quantity:
      property: pipe_length
      unit: cm
      value: 105
      basis: Approximate product length; diameter 6.5 cm in statement.
  - id: fill
    kind: recommendation
    statement: Fit both clips; fill 60–70% with unfertilized mineral soil.
    applicability:
      conditions: Plus Y’s nagaimo-specific Clever Pipe preparation branch; Japanese buried garden-soil
        system, not a freestanding pot or jinenjo recipe.
    evidence:
    - source_id: plusys-pipe
      relation: supports
      locator: STEP1 steps 1–2 and POINT; material list
    quantity:
      property: pipe_fill_fraction
      unit: '%'
      min: 60
      max: 70
      basis: Approximate portion of pipe filled; supplier does not define compaction or wet/dry measurement.
  - id: trench
    kind: recommendation
    statement: Dig a trench 25 cm wide and 30–40 cm deep.
    applicability:
      conditions: Plus Y’s nagaimo-specific Clever Pipe preparation branch; Japanese buried garden-soil
        system, not a freestanding pot or jinenjo recipe.
    evidence:
    - source_id: plusys-pipe
      relation: supports
      locator: STEP1 step 3 and d21.png diagram
    quantity:
      property: trench_depth
      unit: cm
      min: 30
      max: 40
      basis: Below surrounding ground; width 25 cm in statement.
  - id: place
    kind: recommendation
    statement: Set pipes at 10–15°, receivers upward and about 30 cm apart.
    applicability:
      conditions: Plus Y’s nagaimo-specific Clever Pipe preparation branch; Japanese buried garden-soil
        system, not a freestanding pot or jinenjo recipe.
    evidence:
    - source_id: plusys-pipe
      relation: supports
      locator: STEP1 step 4; d3.png and d31.png
    quantity:
      property: pipe_inclination
      unit: degree
      min: 10
      max: 15
      basis: From horizontal as illustrated; receiver spacing approximately 30 cm.
  - id: mark
    kind: recommendation
    statement: Mound matching soil over receivers; put a vertical marker centrally in each.
    applicability:
      conditions: Plus Y’s nagaimo-specific Clever Pipe preparation branch; Japanese buried garden-soil
        system, not a freestanding pot or jinenjo recipe.
    evidence:
    - source_id: plusys-pipe
      relation: supports
      locator: STEP1 steps 4–5 and d31.png
  - id: ridge
    kind: recommendation
    statement: Build roughly 20 cm of soil above the pipes.
    applicability:
      conditions: Plus Y’s nagaimo-specific Clever Pipe preparation branch; Japanese buried garden-soil
        system, not a freestanding pot or jinenjo recipe.
    evidence:
    - source_id: plusys-pipe
      relation: supports
      locator: STEP1 step 6; d31.png and e1.png
    quantity:
      property: ridge_soil_height
      unit: cm
      value: 20
      basis: Above pipe/receiver level as diagrammed, not below-ground trench depth.
  relations:
  - predicate: applies_to
    target: /crops/chinese-yam.md
---

# Prepare a buried nagaimo pipe bed


## Purpose and prerequisites

Prepare the bed through marking and ridging; seed placement and the subsequent growing season are separate tasks. First read the [crop identity and regional restrictions](../crops/chinese-yam.md) and [pipe-method decisions](../guides/nagaimo-pipe-decisions.md). Confirm permitted cultivation, labeled nagaimo stock and the actual equipment instructions before purchasing or moving planting material.

Have the specified pipe and clips, mineral fill, marker rods, digging tools and enough accessible ground for excavation and eventual pipe removal. This preparation is not a soil-free growing system. Obtain the supplier's fill specification; ordinary garden soil has not been demonstrated pathogen-free by its appearance or collection depth.

## Prepare the bed

<a id="hardware"></a>
Use the nagaimo pipe: approximately 105 cm long and 6.5 cm diameter.[^plusys-pipe]

<a id="fill"></a>
Fit both clips; fill 60–70% with unfertilized mineral soil.[^plusys-pipe]

<a id="trench"></a>
Dig a trench 25 cm wide and 30–40 cm deep.[^plusys-pipe]

<a id="place"></a>
Set pipes at 10–15°, receivers upward and about 30 cm apart.[^plusys-pipe]

<a id="mark"></a>
Mound matching soil over receivers; put a vertical marker centrally in each.[^plusys-pipe]

<a id="ridge"></a>
Build roughly 20 cm of soil above the pipes.[^plusys-pipe]

## Inspect before planting

Editorial checks: photograph receiver and marker positions before covering; record measured trench dimensions, pipe model and fill batch. Confirm that each marker stays aligned with its receiver and remains visible after ridging. If a marker moves, expose the receiver and restore alignment before using it to locate planting stock. Retain access to the buried equipment for later excavation.

This task ends with a mapped, prepared bed. Continue with [pipe-specific seed placement](plant-nagaimo-pipe-bed.md), after resolving stock preparation, local season, fertility and irrigation. The [harvest task](harvest-nagaimo-pipes.md) owns equipment removal. These linked tasks do not yet form a complete whole-season care route or establish yield advantage or containment efficacy.

[Crop hub](../crops/chinese-yam.md) · [Source review](../sources/chinese-yam-research.md).


[^plusys-pipe]: [Plus Y’s — Nagaimo and jinenjo Clever Pipe instructions](https://plusys.blog/cleverpipe.html).
