---
type: Guide
title: Choose a peach training system before combining instructions
description: Separates standard-spacing open-centre establishment from UGA perpendicular-V planning.
status: draft
sources:
- id: uga-c878
  title: Thapa Magar and Chavez — Simple Tree Training Technique for Peaches, UGA C878, reviewed September
    16, 2026
  resource: https://fieldreport.caes.uga.edu/publications/C878/simple-tree-training-technique-for-peaches/
steelthumb:
  ontology_version: '0.2'
  license: MIT
  claims:
  - id: layout
    kind: recommendation
    statement: The perpendicular-V layout uses 6 ft within rows and 18–20 ft between rows; without an
      equipment path, between-row spacing may be 12–14 ft.
    applicability:
      conditions: UGA southeastern US perpendicular-V system; planning comparison, not an executable complete
        pruning route.
    evidence:
    - source_id: uga-c878
      relation: supports
      locator: Using the System
    quantity:
      property: within_row_spacing
      unit: ft
      value: 6
      basis: V system only; statement retains separate equipment and home-orchard row widths.
  - id: framework
    kind: recommendation
    statement: Retain two primary scaffolds in one plane perpendicular to the row.
    applicability:
      conditions: UGA southeastern US perpendicular-V system; planning comparison, not an executable complete
        pruning route.
    evidence:
    - source_id: uga-c878
      relation: supports
      locator: Using the System; Figure 1
    quantity:
      property: primary_scaffold_count
      unit: scaffold
      value: 2
      basis: V framework; not an open-centre scaffold count.
  - id: retain
    kind: recommendation
    statement: Do not head or bench-cut the selected V scaffolds; remove competing vigorous vertical growth.
    applicability:
      conditions: UGA southeastern US perpendicular-V system; planning comparison, not an executable complete
        pruning route.
    evidence:
    - source_id: uga-c878
      relation: supports
      locator: Using the System; Figures 1–2
  - id: wood
    kind: recommendation
    statement: During sprout removal, preserve tender shoots that can carry the following season’s fruit.
    applicability:
      conditions: UGA southeastern US perpendicular-V system; planning comparison, not an executable complete
        pruning route.
    evidence:
    - source_id: uga-c878
      relation: supports
      locator: Using the System; Figure 2
  - id: late
    kind: recommendation
    statement: Avoid severe late-season pruning because it can stunt growth or increase sensitivity to
      early freezes.
    applicability:
      conditions: UGA southeastern US perpendicular-V system; planning comparison, not an executable complete
        pruning route.
    evidence:
    - source_id: uga-c878
      relation: supports
      locator: Using the System
---

# Choose a peach training system before combining instructions

For [peach](../crops/peach.md), choose the intended tree structure before using a spacing or cutting instruction. The [open-centre procedure](../procedures/train-peach-open-centre-georgia.md) owns its initial framework and second-season crop-removal task.

## Perpendicular V: separate planning route

<a id="layout"></a>
The perpendicular-V layout uses 6 ft within rows and 18–20 ft between rows; without an equipment path, between-row spacing may be 12–14 ft.[^uga-c878]

<a id="framework"></a>
Retain two primary scaffolds in one plane perpendicular to the row.[^uga-c878]

<a id="retain"></a>
Do not head or bench-cut the selected V scaffolds; remove competing vigorous vertical growth.[^uga-c878]

<a id="wood"></a>
During sprout removal, preserve tender shoots that can carry the following season’s fruit.[^uga-c878]

<a id="late"></a>
Avoid severe late-season pruning because it can stunt growth or increase sensitivity to early freezes.[^uga-c878]

Do not use V-system density with the open-centre scaffold sequence. The current C878 article describes retaining a second-season crop, whereas C877 removes it in its standard-spacing route. These are different production strategies; neither establishes guaranteed early yield.

The V article's angle text displays an unresolved “25–40E” character sequence. Figure 1 confirms an outward V but does not label an exact angle. Exact angle and a local training demonstration are required before this planning guide becomes a full procedure. The article also combines an early-February dormant-pruning example with wording about following frost risk; do not treat that date as proof local frost risk has ended. Resolve calendar and bud stage with local extension.

Editorial observation plan: record row direction, intended scaffold origins, vigorous vertical shoots and preserved potential fruiting shoots. Compare subsequent canopy shading and shoot development. Branch damage or uncertainty about fruiting wood calls for a local diagnosis before further removal.

Yield comparisons and numeric early fruit loads are not adopted from this summary article; underlying trials and cultivar dependence need inspection. [Research scope](../sources/peach-training-research.md). UK fan, compact pot and protected-system training still need separate work.


[^uga-c878]: [Thapa Magar and Chavez — Simple Tree Training Technique for Peaches, UGA C878, reviewed September 16, 2026](https://fieldreport.caes.uga.edu/publications/C878/simple-tree-training-technique-for-peaches/).
